The first two wind-powered generators of the IWP-100.ar machine were designed and manufactured at the facilities located in Mendoza and are already assembled in Parque Eólico Araujo, in La Rioja. They are achieving availability higher than 99.0%. This value exceeds the minimum requirements set by the market for this type of machines.

The next IWP-100.ar wind-powered generators for Arauco IV are being commissioned and assembled at the wind farm.