Availability of new IWP-100.ar units – Arauco IV

The first two wind-powered generators of the IWP-100.ar machine were designed and manufactured at the facilities located in Mendoza and are already assembled in Parque Eólico Araujo, in La Rioja. They are achieving availability higher than 99.0%. This value exceeds...

Movement of large oil equipment

The movement of twelve oil equipment (engine-driven compressors) from Terminal Zárate, in Buenos Aires, to the Free Trade Zone, in Mendoza, was successfully completed. This operation, in charge of Transapelt, was performed for Comexar Shipping, being Compressco the...