IMPSA has officially handed over the Helios Santa Rosa II Photovoltaic Solar Park. Final Acceptance Certificate was recently signed, following the completion of the contractual warranty period, which began with the park’s commercial operations in May 2024.
This milestone was achieved with the park’s successful performance from its commissioning, without requiring IMPSA´s team assistance throughout this period, thus confirming the quality of the work performed in a timely manner.
Helios Santa Rosa II, located in Santa Rosa, Mendoza, has a capacity of 5.2 MW. IMPSA developed the engineering, general management, and executed the commissioning of this project, whose generated energy is traded on the Renewable Energy Term Market (MATER).