The Embalse Nuclear Power Plant (NEC) in Córdoba has been operating since 1983, but its guaranteed lifetime of 30 years expired in 2013. The national government and the operator Nucleoeléctrica Argentina proposed to repower it and extend its life for another 30 years, a project that was entrusted to the Canadian technologist Babcock & Wilcox. IMPSA manufactured the four new Steam Generators of greater capacity than the original ones, capable of producing the necessary amount of steam for the power increase imposed to the NEC (40 MW) following the most demanding nuclear quality standards.
Recent Posts
- Juan Manuel Dominguez, IMPSA’s Vice President, leads the Argentina Chapter of the Argentine-American Chamber of Commerce in Florida
- IMPSA modernizes and commissions Yacyretá Hydroelectric Power Plant Unit 4
- Strategic Alliance – ARC Energy and IMPSA join forces to promote the development of the Oil & Gas market in Argentina and Latin America
- New Country Manager
- Abigail L. Dressel, Deputy Chief of Mission at the U.S Embassy in Buenos Aires, visited IMPSA