News

A tower nearly 30 meters long traveled from IMPSA to YPF

Today, in the early hours of the morning, the deoxygenator tower that IMPSA designed and manufactured in its Mendoza Technological Development Center, was moved to the Barrancas Site of YPF, in Luján de Cuyo. The main function of the 32,550 Kg piece of weight will be...

read more

IMPSA is in the Vanguard of 4.0Industry and New Technologies

In order to analyze and spread innovative tools and solutions for managing new intelligent electrical distribution grids, the Conference on Artificial Intelligence Applied to Electrical Distribution Grids was organized by IMPSA and ICSA. This conference was attended...

read more

IMPSA’s 200th Turbine Travels around the Country

This is the first out of 20 turbines that should be replaced at Yacyretá Hydroelectric Power Station. It was designed and manufactured by IMPSA in Mendoza and will supply electricity to 270 000 families. It will be moved in 10 trucks during 15 days. IMPSA, through its...

read more